Module 9003

Assignment 1

Distillation Group Project

 

Group 2 – Acetic Acid-Acetic Anhydride System

 

 

Background

 

A waste stream in an Aspirin production process is a mixture of Acetic Acid and Acetic Anhydride.  It is proposed to separate these two components by distillation.  The waste stream flowrate consists of 775 mol/hr of Acetic Acid and 300 mol/hr of Acetic Anydride.

Task

 

You are required to investigate the following:

 

·        Should continuous or batch distillation be used?  Choose one option, justify the decision, and proceed with the rest of the assignment on this basis.

·        What size will the distillation column be? (Height and footprint)

·        What will be the composition of the bottom and distillate streams?

·        How will the feed be supplied to the distillation unit?

·        What will be the capital cost? (A rough estimate).

·        What will be the operating cost?

·        What is the approximate payback time on capital cost?

 

Your report should include the following:

 

·        Details on the column internals.

·        A process flow diagram for the system.

·        For the batch option, how long will a distillation take.

·        An energy balance.

·        Details on the reboiler and condenser (size, material of construction, etc.).

·        Operating conditions (stream temperatures and pressures, reflux ratio, etc.)

 

Prepare a report to address all of the above issues.  State clearly any assumptions made and reference all information sources used.